person_checkOwnerNot specifiedperson_textApplicantDino MannoengineeringContractorNot specified descriptionWork Descriptioninstall 22 modules dc/to a/c conveter to existing system with existing battery backup
person_checkOwnerNot specifiedperson_textApplicantIsaac Blevins Jr.engineeringContractorNot specified descriptionWork DescriptionInstallation of roof mount solar panels with battery
descriptionWork Descriptionroof mounted 20 solar panels and battery backup
descriptionWork DescriptionInstalling rooftop solar panels and meter main combo,
descriptionWork Description17.1kw pf roof install / 38 panels with ess and expantion pack(s); mpr; install a new ameren approved 200 amp meter/main • panel with lever bypass and 100 amp main breaker. Service feeder wires to be replaced; meter bypass level meter base per plans
descriptionWork Description9.45kw PV roof install / 21 panels with ess; meter enclosure: install a new ameren approved200a amp meter/main panel with lever bypass and 100a amp main breaker. • vehicle impact protection bollards are required at battery location • weatherhead relocation, de-energize lines for install, meter intercept for ameren utility, meter replacements for ameren utility; meter bypass level meter base per plans.
descriptionWork Description9kw PV roof install / 20 panels with ess and expantion pack; meter bypass level meter base per palns.
descriptionWork DescriptionSolar Panel Installation-14 MODULES - SYSTEM SIZE STC (6.30 kW DC / 6.00 kW AC)
descriptionWork DescriptionRoof mounted installation of (43) REC Solar PV modules and (43) Enphase IQ8X microinverters. Interconnection via supply side connection in main.
descriptionWork Description21.15 PV roof install / 47 panels with ess; meter bypass level meter base per plans.
descriptionWork Description9.9kw PV roof install / 22 panels with ess and espantion pack; meter bypass level meter base per plans.
descriptionWork Description28 MODULES- ROOF MOUNTED- 12.32 kWDC, 10.00 kWAC/ upgrade from 100 to 200 amp
descriptionWork Description14.4kw PV roof install / 32 panels with ess; expantion pack; line drop needed for overhead service; meter bypass level meter base per plans.
descriptionWork Description13.5kw PV roof install / 30 panels with ess; new 200 amp meter; bypass level meter base per plans. Trenching to be done by subk.
descriptionWork Description13.6kw PV roof install / 28 panels with ess & expantion pack; meter bypass level meter base per plans.
descriptionWork DescriptionRoof mounted solar installation
person_checkOwnerNot specifiedperson_textApplicantSun SolarengineeringContractorNot specified descriptionWork DescriptionInstallation of roof mounted photovoltaic solar system with battery
descriptionWork DescriptionSolar PV system with 12.150 KW DC ROOF MOUNT and 1 Tesla Powerwall 3
descriptionWork DescriptionInstalling rooftop solar panels.
descriptionWork Description8.55kw PV roof install / 19 panels with ess; meter bypass level meter base per plans.
Understanding Solar Permit Records
Solar permits can help track where installations are appearing and which companies are active in the local market. Permit counts show recorded activity, not total generating capacity or completed installations. A permit does not confirm that a system was installed, connected to the electric grid, or placed into service.
PermitExplorer compiles information from publicly available sources. Confirm information that affects a property, project, transaction, or professional decision with the appropriate government office.