person_checkOwnerNot specifiedperson_textApplicantJean UnderwoodengineeringContractorNot specified descriptionWork DescriptionReplace back supported concrete slab and sidewalk
person_checkOwnerNot specifiedperson_textApplicantSoumya MurthyengineeringContractorNot specified descriptionWork DescriptionRemodel 10,315 SF of existing store, and build 3,926 SF addition for online grocery pickup.
descriptionWork DescriptionRemove partion walls for new layout, drywall - paint - new flooring
person_checkOwnerNot specifiedperson_textApplicantLevi LemanengineeringContractorNot specified descriptionWork DescriptionInterior remodeling purpose daycare use.
person_checkOwnerNot specifiedperson_textApplicantPeter ParaskisengineeringContractorNot specified descriptionWork DescriptionRemove a concrete around the metal frame of a walk out from building to stairs. Reinforce walkout based on structural engineers plans. Poor new walkout. Repair rusted railing
descriptionWork DescriptionComplete renovation of 20 apartment units
descriptionWork DescriptionWater heater emergcy lights ect office wall
descriptionWork DescriptionVerizon plans to upgrade their antennas on SBA's existing cell tower. No groundwork or extension of the tower is being proposed.
person_checkOwnerNot specifiedperson_textApplicantJacob ElderengineeringContractorNot specified person_checkOwnerNot specifiedperson_textApplicantYvonne MorrealeengineeringContractorNot specified descriptionWork DescriptionNew Storage Shed
person_checkOwnerNot specifiedperson_textApplicantJames FouseengineeringContractorNot specified person_checkOwnerNot specifiedperson_textApplicantMatthew PicaengineeringContractorNot specified descriptionWork DescriptionInstall 18 x 20 Metal Shade Structure for produce
descriptionWork DescriptionUPS store buildout
descriptionWork DescriptionOnline Pickup Door