descriptionWork DescriptionThis bid is for the demolition and debris removal at the above said location. The house will be demolished, and debris will be hauled to a certified landfill. The lot will then be backfilled to grade, then seeded.
person_checkOwnerNot specifiedperson_textApplicantNot specifiedengineeringContractorNot specified
descriptionWork DescriptionElectrical work performed without a permit.
descriptionWork Descriptionroof replacement
descriptionWork Descriptionreplace supplied water heater
person_checkOwnerNot specifiedperson_textApplicantArthur BinderengineeringContractorNot specified descriptionWork Descriptionreplace furnace thru winterization
descriptionWork Descriptionwaste and vents for new sewage ejector system
descriptionWork Descriptionroof replacement
descriptionWork DescriptionRoof Replacement
descriptionWork DescriptionTap water main and install new water service
descriptionWork DescriptionReplace roof
descriptionWork Descriptionreplace roof
descriptionWork DescriptionRemove and replace existing asphalt shingles and underlayment
descriptionWork Descriptionwood slat privacy fence
descriptionWork DescriptionComplete renovation of 20 apartment units
descriptionWork Description• system size: 6.15kw dc, 5.76kw ac• modules: (15) hanwha q-cells: q.peak duo blkml-g10+ 410• inverters: (1) solaredge technologies:se5700h-usmn• optimizers: (15) solaredge technologies: u650• energy storage system: (1) franklin: apower xyyy15kwh, 10kw inverter output, lithium ironphosphate battery (weight: 357lb each)• microgrid interconnect device: (1) 280a agate xcontrol panel• racking: alphatrack to framing - snr-dc-00370• de-energize lines for install, meter intercept forameren utilit• new meter enclosure
person_checkOwnerNot specifiedperson_textApplicantLeah HoughtonengineeringContractorNot specified descriptionWork DescriptionInstalling 11.500KW solar system with energy storage with new 100A Bi-Directional meter W/ 100A emergency disconnect
descriptionWork DescriptionRoof mounted 16 solar panels (7.2 kw)
person_checkOwnerNot specifiedperson_textApplicantStaci FrantzengineeringContractorNot specified descriptionWork Descriptionupgrade to 200a base to meter main combo, install 200a panel, grouning per code, GFCI receptacles, install wireless interconnected smoke/co2 detectors.
descriptionWork Descriptionroof replacement
descriptionWork DescriptionTub to Shower Base Conversion in Master Bathroom