person_checkOwnerNot specifiedperson_textApplicantTron Solar LLCengineeringContractorNot specified descriptionWork DescriptionInstallation of a roof-mounted, 7.38kW PV solar system.
descriptionWork DescriptionReplace water heaters
descriptionWork Descriptionnew water heater
descriptionWork DescriptionThree SettleStop Push Piers and 9 LNFT of a Supplemental Beam to correct foundation settlement.
descriptionWork DescriptionWall sign for Keller Williams
person_checkOwnerNot specifiedperson_textApplicantLuke LuginbuhlengineeringContractorNot specified descriptionWork Description22-panel, 9.68 DC kW/8.36 AC kW solar array mounted on roof of residence; line-tapping 100A disconnect; conduit will be run through attic.
descriptionWork Descriptioninstall permit
descriptionWork Description7 SettleStop Push Piers to stablize foundation
descriptionWork DescriptionReplacing pylon sign near Pershing Rd.
descriptionWork DescriptionFire damage remodel
descriptionWork DescriptionWall replacement - replacing a 12' by 6" section of existing foundation wall
descriptionWork DescriptionRemove and replace existing asphalt shingles and underlayment with new asphalt shingles and synthetic underlayment
descriptionWork DescriptionReplacement of water heater
descriptionWork DescriptionThe ramp is approximently 15ft long by 4 to 5 feet wide and ends around 6 to 8 inches off ground lever. It is located on the east side of the building. It will be replacing the existing wood ramp that is there now
person_checkOwnerNot specifiedperson_textApplicantMegan MurphyengineeringContractorNot specified descriptionWork DescriptionRoof mount solar array
person_checkOwnerNot specifiedperson_textApplicantKerry PajorengineeringContractorNot specified descriptionWork DescriptionInstalling roof mounted solar arrar. 13 modules, 1 ESS
descriptionWork DescriptionMove service underground
descriptionWork Descriptionnew water heater
descriptionWork DescriptionReplacement of 2 water heaters.
descriptionWork DescriptionNew Service