descriptionWork Descriptionupgrading a service and wiring
descriptionWork DescriptionRoof Replacement
descriptionWork Descriptionnew water heater
person_checkOwnerNot specifiedperson_textApplicantJulie HensleyengineeringContractorNot specified descriptionWork DescriptionHVAC
descriptionWork DescriptionInstall a generator and transfer switch
descriptionWork DescriptionAdding emergency lights and exit signs as needed.
descriptionWork DescriptionReplace furnace and ac
descriptionWork Descriptionroof mounted 28 solar panels (12.6 kw)
descriptionWork Description9kw PV roof install / 20 panels; ess; meter enclosure: new ameren approved 100 amp millbank meter main with lever bypass will replace existing undersized meter with new ameren approved 200a/200a meter/main panel with lever bypass per plans
person_checkOwnerNot specifiedperson_textApplicantJulie HensleyengineeringContractorNot specified descriptionWork DescriptionReplace air conditioners
descriptionWork DescriptionTub to shower base conversion in existing bathroom
descriptionWork Descriptioninstall new water heater
person_checkOwnerNot specifiedperson_textApplicantDewayne FendersonengineeringContractorNot specified descriptionWork Descriptionnew plumbing, wiring of house
descriptionWork DescriptionRoofing
descriptionWork DescriptionNew 200a Meter Combo Only
descriptionWork DescriptionNew Construction of McDonald's
descriptionWork DescriptionReplacing water service type 2 existing in the house / in the right of way, Kelley Sewer is doing ROW permit
descriptionWork Description200 amp service upgrade/rewire
person_checkOwnerNot specifiedperson_textApplicantScott HutchinsonengineeringContractorNot specified descriptionWork DescriptionFence to be built on top of current dock structure. The portion parallel to the road is constructed of 6ft long by 4ft tall aluminum fencing panels show in blue with quantity 2 - 4ft x 4ft gates shown in black. The portion perpendicular to the road is constructed of 6ft long by 5ft tall aluminum fencing panels shown in green. The fence posts are to be anchored into the dock structure.