Permit Information
Contact Information
Work Description
description19.27 PV roof install / 47 panels with (2) ess per plans; meter enclosure replacement: meter enclosure relocation meter is undersized and too close to a/c unit, new ameren approved 200 amp millbank meter main combo • main panel replacement: existing 100 amp main panel with 100 amp main breaker to be replaced with new 200 amp main panel with 200 amp main breaker; meter bypasslevel meter base.
Other Permits at This Address