descriptionWork DescriptionInstalltion of residential roof mounted solar panels
descriptionWork DescriptionInstallation of residential roof mounted solar panels w/ added sow: main panel replacement: existing 200 amp main panelwith 200 amp main breaker to be replaced with new225 amp main panel with 200 amp main breaker.service entrance conductors to be replacedtrenching required: ac wire to be trenched 85 ft indirt material
descriptionWork DescriptionInstallation of residential roof mounted solar panels w/ added sow: meter can replacement: existing meter can to bereplaced with new meter can.main panel replacement: existing 100 amp main panelwith 100 amp main breaker to be replaced with new125 amp main panel with 100 amp main breaker
descriptionWork DescriptionInstallation of residential roof mounted solar panels
descriptionWork DescriptionInstallation of residential roof mounted solar panels
descriptionWork DescriptionInstallation of residential solar panels w/ added scope of work: meter enclosure replacement: replace existingundersized meter with new ameren approved200a/100a meter/main panel with lever bypass.• trenching required: ac wire to be trenched 24 ft indirt material.
descriptionWork DescriptionInstallation of residential roof mounted solar panels.
descriptionWork DescriptionInstallation of residential solar panels
descriptionWork DescriptionInstallation of residential roof mounted solar panels.
descriptionWork DescriptionInstallation of residential solar panels w/ sow: meter can replacement: existing meter can to bereplaced with new meter can.
descriptionWork DescriptionInstallation of resdiential roof mounted solar panels w/ added sow: replace existing meter enclosure with a new 200aameren approved lever bypass meter/main panel
descriptionWork DescriptionInstallation of resdiential solar panels w sow: • sub panel replacement: existing 100 amp main subpanel with 100 amp sub main breaker to be replacedwith new 125 amp sub panel with 100 amp sub mainbreaker.• meter enclosure : install new 200a/100a amerenapproved lever bypass meter-main.• service entrance conductors to be replaced.• refeed line and load side from meter to weatherhead and meter to interior sp.
descriptionWork DescriptionInstallation of residential solar panels w/ added scope of work:• service entrance conductors to be replaced.• replace meter with new 200a/200 meter/main withlever bypass• replace or install new service mast &weatherhead• new 125a nbulp next to the main panel. Less than6ft
descriptionWork DescriptionInstallation of residential roof solar panels
descriptionWork DescriptionInstallation of residential solar panels w. Added scope of work: -sub panel replacement: existing 200 amp sub panelwith 200 amp sub breaker to be replaced with new200 amp sub panel with 200 amp sub breaker.-service entrance conductors to be replaced.-meter main combo replacement: newameren-approved 200a panel with new 200a mainbreaker.
descriptionWork DescriptionInstallation of residential solar panels
descriptionWork DescriptionInstallation of residential solar panels w/ added scope of work: meter adapter: install a new ameren approved200a/200a meter/main panel with lever bypass
descriptionWork DescriptionInstallation of residential solar panels
descriptionWork DescriptionInstallation of residential solar panels
descriptionWork DescriptionInstallation of residentila solar panels w/ added scope of work: meter can replacement: existing meter can to bereplaced with new 200a/150a meter-main panel.